← All Italian road signs

Start of built-up area

Start of built-up area

Official Italian name: Inizio centro abitato

What it means

You are entering a town. The general limit of 50 km/h applies unless signs show otherwise.

How to recognise it

Information signs are rectangles or squares. The colour tells you the type of road: green for motorways, blue for other roads outside towns, white in towns, brown for tourist places.

Where you see it

At the entrance of every town and village, with its name.

Common mistake by drivers from abroad

The 50 km/h limit starts at the sign, even if you do not see houses yet.

Legal basis

This sign is defined by art. 131 of the Regulation of the Italian Highway Code (Presidential Decree 495/1992).

Not respecting it is an offence under art. 142 of the Italian Highway Code.

Fines for this offence: how they work and when you can appeal →

Got a fine because of a sign?

Send us a photo of the fine: we check deadlines, data and grounds for appeal and prepare the appeal for you to file. From €19.90 per fine.

Check my fine – from €19.90

Other signs in this group

Limited traffic zone (ZTL)End of limited traffic zone (ZTL)Pedestrian zoneEnd of pedestrian zoneResidential zoneZone with speed limitEnd of built-up areaParkingPedestrian crossingMotorwayDirection sign outside townsDirection sign in townsFirst aidRoad closedRoad open, chains or winter tyres required

Drawing: RicorsoVelox, simplified from the official figure in the Regulation of the Highway Code (DPR 495/1992). The sign on the street always prevails.

General information, not legal advice. Panels under a sign can change its meaning: always read them.